Ship Repair,International Ship Repair,electrical
GENERAL NOTICE
1.The rates quoted herein are in US Dollars.
2.The rates are applicable to the works carried out the normal working hours, that is five working days a week, and eight working hours a day. Ant works done outside of this hours or on National holidays and yards holidays shall be charged with extra overtime, ship on voyage repair will be priced extra.
3.All prices quoted herein are for ship repairs carried out in the premises of shipyard, extra price should be added for such repairs carried at the port berth, buoys, anchorage according to the actual work to be done.
4.Any vessel during the period of repair in the yard, unless agreed by the yard, the Customer shall not be permitted to employ any labour other than yard to perform repairs.
5.The yard shall not be responsible for the consequences of war, earthquake or causes beyond yards control.
6.All scrapped material except heavy parts of machinery, propeller and tailshafts shall be yards property.
7.This tariff is applicable to repair of freight carriers only, repairs of other types of ship are beyond of this tariff scope.
8.This tariff becomes effective from January 1st 2007 subject to revised price depending on the change in material cost etc. without notice.
1. Motor
Removal to workshop, open up, clean, varnish, bake, close up and test on completion.
Power (KW) |
AC motor |
DC motor |
1 3,7 7,5 10 15 20 30 40 50 60 75 100 |
117 210 290 313 422 547 654 702 765 844 960 1240 |
135 240 336 360 485 629 752 807 880 970 1104 1426 |
Note: (1)Staging and attached work excluded. (2)Same noumenon transverter motor add 50% multi speed motor add 50%, fan motor add 25%. (3)Bearing renew shall be extra.
2. Generators (AC)
A.C. alternator rotor drawing out, remove to workshop, measure megger, varnish, bake, polish commutator or rings, close up and test on completion.
Power (KW) |
AC motor |
50 100 200 300 400 500 600 800 1000 |
1055 1464 1920 2222 2524 2826 3024 3456 3960 |
Note: (1)For D.C. generators, 10% shall be added to above prices. (2)Bearings renew shall extra. (3)Staging and attached works excluded.